Tucker
01-29-2009, 10:27 AM
We have been hinting for a while now, but wanted to show you were very close to having them ready.
The plugs are made and off to the mold maker. At this point I can expect a proto type in about 4 weeks. Then test fit and ok (hopfully) and get production rolling.
I have no idea on price at this time, sorry.
They will be made from high quality carbon fiber and fully Autoclaved just like our radaitor support is.
I will post up more info as I get it.
Parts are shown in black primer.
http://www.jlttruecoldair.com/gallery/pictures/tn_Extensions%20005.jpg
http://www.jlttruecoldair.com/gallery/pictures/tn_Extensions%20001.jpg
We are also working on carbon fiber engine caps and a carbon fiber splitter overlay.
Keep a eye out for more info as I move on with these parts.
Thanks
Jay
The plugs are made and off to the mold maker. At this point I can expect a proto type in about 4 weeks. Then test fit and ok (hopfully) and get production rolling.
I have no idea on price at this time, sorry.
They will be made from high quality carbon fiber and fully Autoclaved just like our radaitor support is.
I will post up more info as I get it.
Parts are shown in black primer.
http://www.jlttruecoldair.com/gallery/pictures/tn_Extensions%20005.jpg
http://www.jlttruecoldair.com/gallery/pictures/tn_Extensions%20001.jpg
We are also working on carbon fiber engine caps and a carbon fiber splitter overlay.
Keep a eye out for more info as I move on with these parts.
Thanks
Jay